1. ELIGIBILITY
2. SELECTION
3. REQUEST TO
PARTICIPATE
4. ARCHITECTURAL
AND ACOUSTIC
MEASUREMENTS
5. DESIGN PRESENTATION
6. BID PACKAGE
7. CONTRACTOR VISIT
8. CONSTRUCTION
9. ACOUSTICAL
MEASUREMENTS –
AFTER CONSTRUCTION
10. WARRANTY

 

Program Overview | Our Approach | What to Expect | Contractor Information
FAQs | Glossary | Contact Us

Our Approach
Step 7: Contractor Visit
 

Once the bid package has been awarded to a contractor, he or she will need to return to your home to take final measurements for specified materials such as windows and doors. A representative of the Sound Insulation Program will be present during this walk-through meeting. Other issues that will be addressed at this meeting are finishing details, such as door colors and wood trim finishes. To allow enough time for all the materials to be ordered, this meeting will occur well before actual construction.


Lehigh Valley International Airport | 3311 Airport Rd. Allentown, PA 18109
1-800-FLY LVIA Fax: 610-264-0115 our Airport Booking Code is ABE

Home | Info Booth | Flight Info | Directions/Maps | Parking | Sound Insulation Program | Contact Us
Copyright © 2008 Lehigh Valley International Airport. All rights reserved.